NepalFlag

वि.सं:

नेपाल संवत: ११४५ कछलागा षष्ठी - २१

प्रमुख विशेषताहरु

SALIENT FEATURES OF NAUMURE MULTIPURPOSE PROJECT

Naumure Hydro Scheme

Districts

: Pyuthan/Arghakhanchi

Catchment Area

: 3414 km2

Installed Capacity

: 218.34 MW

Gross Head

: 164 m

Net Head

: 160.3m

Design Discharge

: 154 m3/s

Full Supply Level (FSL)

: 524 masl

Minimum Operating Level (MOL)

: 473 masl

Reservoir/ Submergence Area

: 18.03 km2

Dam Type

: Concrete Face Rockfill Dam (CFRD)

Dam Height (from the river bed)

: 169 m

Dam Crest Level

: 531 masl

Minimum Drawdown Level

: 473 masl

Concrete Chute Spillway Crest Level

: 493 masl

No. of Spillway bays

: 5 (11 m x 16.5 m gates)

Spillway Design Flood

: 12140 m3/s(PMF flood)

Power Intake Nos

: 2

Intake Tunnel Dia.

: 4.5 m x 2

Pressure Shaft Dia.

: 6.35 m

Pressure Shaft Length

: 592 m

Powerhouse

: Underground Cavern type

Turbine Centre Line

: 356.4 masl

Turbine

: Francis (3 nos.) 300 rpm

Tail Water Level

: 360 masl

Tailrace Tunnel Length

: 1.2 km

Tailrace Tunnel Dimension

: D-shaped 8m x 8m

Average Annual Energy

: 874 GWh (after deduction of outages/losses)

Average Annual Dry Energy

: 305.90 GWh (35 %)

Average Annual Wet Energy

: 568.10 GWh (65 %)

Access Road Length

: 22.94 km from Jhilibang to project area (total)

Transmission Length

: 55 km (220 kV) Up to New-Lamahi Substation

Gross Storage

: 1066.85 MCM

Active Storage

: 694.33 MCM

Dead Storage

: 259.29 MCM

Average River Bed Elevation

: 362 masl

Turbine Efficiency

: 92%

Generator Efficiency

: 98%

Generator Equipment Type

: 3 Phase Synchronous, 85.62 MVA, 11 kV, 300 rpm

Transformer Efficiency

: 99%

Project Cost

: 91,922.937 Million NRs. (including costs from EIA)

Per MW Cost

: 375.05 Million NRs.

Lamatal Hydro Scheme

District

: Pyuthan/Arghakhanchi

Catchment Area

: 3572 km2

Installed Capacity

: 8 MW

Gross Head

: 7 m

Net Head

: 6.65m

Design Discharge

: 136.20m3/s

Tailrace Water Level:

: 352 masl

Full Supply Level (FSL)

: 359 masl

Minimum Operating Level (MoL)

: 356 masl

Barrage Crest Elevation

: 360.5 m (1.5m freeboard)

Reservoir/ Submergence Area

: 1.22 km2

Power Intake Type

3 Submerged Bellmouth Type Intakes

Intake diameter

: 5.6 m

Spillway Type

: Orifice Type Spillway equipped with Radial Gates

No. of Spillway Bays

: 22 ( 10m x 4m gates)

Spillway Design Discharge

: 7873 m3/s (1000 yrs Return Period Flood)

Energy Dissipator

Hydraulic-jump type Stilling basin

Barrage Height

: 15.5 m

Powerhouse

Semi-Surface Powerstation at Barrage Toe

Penstock diameter

: 4m

Turbine Centre Line

: 345 masl

Turbine

Kaplan (3 nos.) 150 rpm

Tail Water Level

352 masl

Annual Gross Energy

38.90 GWh (after deduction of outages/losses)

Gross Dry Season Energy

14.61GWh (37%)

Gross Wet Season Energy

24.29GWh (63 %)

Access Road Length

22.94 km from Jhilibang to project area (total)

Transmission Length

4.6km (33kV) to Naumure Switchyard

Gross Storage

6.46 MCM

Active Storage

: 3.02 MCM

Average River Bed Elevation

: 345 masl

Site Coordinates

: 82°53"22" E and 27°54"30" N

Irrigation Facilities:

Deukhuri

:10,800 ha with 310.96Mm3 of annual water demand

Banke

:42,766 ha with 959.55Mm3 of annual water demand

Kapilvastu

:29,736 ha with 647.02 Mm3 of annual water demand

Total=

:83,302 ha with total 1917.53 Mm3 of annual water demand

Turbine Efficiency

: 92%

Generator Efficiency

: 98%

Generator Equipment Type

3 Phase Synchronous, 3.14 MVA, 6.6 kV, 150 rpm

Transformer Efficiency

99%

Project Cost

: 5,652.595 Million NRs. (including costs from EIA)

Per MW Cost

655.94 Million NRs. (including cost of Barrage, which is utilized for Surainaka Hydro Scheme as well as

Irrigation Scheme)

Surainaka Hydro Scheme

District

: Arghakhanchi/Kapilvastu

Catchment Area

: not relevant as water will be conveyed from Lamatal Tailrace

Installed Capacity

. 54.7 MW

Gross Head

: 160 m

Net Head

: 148.66 m

Water Level at Headpond

: 351.5 masl

Tailrace Water Level

: 191.5 masl

Design Discharge

: 41.6 m3/s

Intake Orifice nos:

:4 (Q = 45.76m3/s, including 10% flushing)

Intake Orifice Size:

:4m (W) x 2.75m (H)

Approach Canal after Intake Size:

: 4m (W) x 5m (H), 2 nos

Length of Canal

:28.23 m

Settling Basin effective length:

: 100 m

No. of bays

: 2, 25m width each

Approach Canal after Settling Basin:

: 1 nos.

Approach Canal after Settling Basin size:

: 6m (W) x 5m (H)

Length of Canal

: 259.67 m

Headpond before Tunnel

: 6m (W) x 35m (L)

Tunnel Length

: 18 km

Tunnel Diameter

: 5.5 m (Finished Dia.)

Tunnel Slope

: 1:500

Surge Tank Type

: Orifice type (4.5 m dia. Orifice)

Surge Tank Diameter

:12 m

Penstock Diameter

:3.8 m

Penstock Length

:1172.65m (including bifurcation)

Powerhouse

: Semi-Surface Type, 36.9m (L) x 17m (W) x 30m (H)

Turbine Centre Line -

180.5 masl

Turbine

: Francis (2 nos.) 500 rpm

Tailrace Canal

6m (W) x 2.9m (H), 1: 1000 slope

Average Annual Energy

362.81 GWh (after deduction of outages/losses)

Gross Dry Season Energy

: 173.92 GWh (48 %)

Gross Wet Season Energy

: 188.88 GWh (52 %)

Access Road Length

: 5.17 km from East-West Highway up to Surge tank

Transmission Length

: 22 km (220 kV) to Naumure Switchyard

Irrigation Facilities:

Kapilvastu

:29,736 ha

Turbine Efficiency

:92%

Generator Efficiency

:98%

Generator Equipment Type

: 3 Phase Synchronous, 32.175 MVA, 11 kV, 500 rpm

Transformer Efficiency

: 99%

Project Cost

: 18,141.507 Million NRs. (including costs from EIA)

Per MW Cost

: 327.91 Million NRs.

Salient Features of Proposed Kapilvastu Irrigation System

Name of Project: : Kapilvastu Irrigation System

District: Kapilvastu District

Administrative Coverage:

: Shivaraj Municipality (1 to 11)

Krishnanagar Municipality( 1 to 12) Bijayanagar VDC (Ward no. 2 to 7) Buddhabhumi (ward no. 7) Maharajgunj (ward no. 1 to 11)

Cultural Command Area (CCA):

: 29,736 ha (20,243 ha on eastern side & 9,493 ha on

western side)

Source of Water : West Rapti River

Proposed Major Crop Type: Paddy, Wheat, Pulses, Vegetables, Maize, Oilseed

Proposed Cropping Intensity:180%

Maximum Design Discharge:

:43.2 m3/s (29.5 m3/s for East Main Canal & 13.7

m3/s for West main Canal)

Diversion Type

:Slice gate-controlled intake from Pondage with

water supplied from tailrace(NTRL=191.5masl) of Surainaka hydropower

Normal Pond Level at Diversion Pond 2:

:186.75 masl

Length of Main Canal:

: 65.729 km (23.99km in East & 41.73km in the

West)

Length of Secondary Canal:

: 152.24km (85.26km in the East & 67.08km in the

West)

Length of Tertiary Canal:

: 273.66km (134.32km in the East & 138.33km in

the West)

Project Costs

: NRs. 9120.76 (x 10^6) Excluding VAT

Overall Economic and Financial Parameter of Naumure MPP

Note: At 6 % Discount Rate and 2% soft loan (also feasible up to 9% discount rate for interest rate

with soft loan up to 3%)

Total Project Cost (HP, irrigation and EIA costs) : 113770.2301 Million NRs (Without VAT)

Total Project Cost (HP, irrigation and EIA costs) : 125,956.383 Million NRs (with VAT)

EIRR : 10.413 %

FIRR : 9.43 %

NPV : 35646.72 Million NRs.

B/C Ratio : 1.26

Payback Period : 14.06 years

Specific Energy Cost : 14.63

DSCR (Avg) :1.3