सम्पन्न कार्यक्रम/क्रियाकलाप

Completed Programs/Activities
S.N. Programs/Activities Completed On Remarks
1 Perimeter/Boundary Demarcation of Lamatal Reservoir F/Y 2078/79
2 Preparation of Detailed Report on Land Acquisition and Resettlement Plan for Lamatal Reservoir and Hydropower Components F/Y 2078/80
3 Feasibility and EIA Study that includes F/Y 2078/79
i) EIA Report
ii) Final and Consolidated Report with following annexes
1.a Topographical Survey Report
1.b Topography Survey Annexes
2. Hydrology and Sedimentation Study Report
3. Water Resourse Management Report
4a. Geological Baseline Report
5. Seismicity Study Report
6. Flood Control and Benefit Study Report
7. Hydraulic Design Annexes
8. Logistic Survey Report
9. Fisheries Development Plan
10. Tourism Development Plan
11. Construction power annexes
12. Power Market Study Report
13. Power Evacuation Study report
14. Transmission Line study report
15. Transient Stability Study Report
16.a Rate Analysis Study Report
16b. Rate Analysis Annexes
17a.Cost Est. , Eco and Financial Analysis Study Report
17b. Eco Financial Annexes Calc Sheet
18a. Irrigation Study Report
18b.Irrigation Final Drawings