| S.N. | Programs/Activities | Completed On | Remarks |
| 1 | Perimeter/Boundary Demarcation of Lamatal Reservoir | F/Y 2078/79 | |
| 2 | Preparation of Detailed Report on Land Acquisition and Resettlement Plan for Lamatal Reservoir and Hydropower Components | F/Y 2078/80 | |
| 3 | Feasibility and EIA Study that includes | F/Y 2078/79 | |
| i) EIA Report | |||
| ii) Final and Consolidated Report with following annexes | |||
| 1.a Topographical Survey Report | |||
| 1.b Topography Survey Annexes | |||
| 2. Hydrology and Sedimentation Study Report | |||
| 3. Water Resourse Management Report | |||
| 4a. Geological Baseline Report | |||
| 5. Seismicity Study Report | |||
| 6. Flood Control and Benefit Study Report | |||
| 7. Hydraulic Design Annexes | |||
| 8. Logistic Survey Report | |||
| 9. Fisheries Development Plan | |||
| 10. Tourism Development Plan | |||
| 11. Construction power annexes | |||
| 12. Power Market Study Report | |||
| 13. Power Evacuation Study report | |||
| 14. Transmission Line study report | |||
| 15. Transient Stability Study Report | |||
| 16.a Rate Analysis Study Report | |||
| 16b. Rate Analysis Annexes | |||
| 17a.Cost Est. , Eco and Financial Analysis Study Report | |||
| 17b. Eco Financial Annexes Calc Sheet | |||
| 18a. Irrigation Study Report | |||
| 18b.Irrigation Final Drawings | |||