1 | Perimeter/Boundary Demarcation of Lamatal Reservoir | F/Y 2078/79 | |
2 | Preparation of Detailed Report on Land Acquisition and Resettlement Plan for Lamatal Reservoir and Hydropower Components | F/Y 2078/80 | |
3 | Feasibility and EIA Study that includes | F/Y 2078/79 | |
i) EIA Report | |||
ii) Final and Consolidated Report with following annexes | |||
1.a Topographical Survey Report | |||
1.b Topography Survey Annexes | |||
2. Hydrology and Sedimentation Study Report | |||
3. Water Resourse Management Report | |||
4a. Geological Baseline Report | |||
5. Seismicity Study Report | |||
6. Flood Control and Benefit Study Report | |||
7. Hydraulic Design Annexes | |||
8. Logistic Survey Report | |||
9. Fisheries Development Plan | |||
10. Tourism Development Plan | |||
11. Construction power annexes | |||
12. Power Market Study Report | |||
13. Power Evacuation Study report | |||
14. Transmission Line study report | |||
15. Transient Stability Study Report | |||
16.a Rate Analysis Study Report | |||
16b. Rate Analysis Annexes | |||
17a.Cost Est. , Eco and Financial Analysis Study Report | |||
17b. Eco Financial Annexes Calc Sheet | |||
18a. Irrigation Study Report | |||
18b.Irrigation Final Drawings |