SALIENT FEATURES OF NAUMURE MULTIPURPOSE PROJECT
Districts |
: Pyuthan/Arghakhanchi |
Catchment Area |
: 3414 km2 |
Installed Capacity |
: 218.34 MW |
Gross Head |
: 164 m |
Net Head |
: 160.3m |
Design Discharge |
: 154 m3/s |
Full Supply Level (FSL) |
: 524 masl |
Minimum Operating Level (MOL) |
: 473 masl |
Reservoir/ Submergence Area |
: 18.03 km2 |
Dam Type |
: Concrete Face Rockfill Dam (CFRD) |
Dam Height (from the river bed) |
: 169 m |
Dam Crest Level |
: 531 masl |
Minimum Drawdown Level |
: 473 masl |
Concrete Chute Spillway Crest Level |
: 493 masl |
No. of Spillway bays |
: 5 (11 m x 16.5 m gates) |
Spillway Design Flood |
: 12140 m3/s(PMF flood) |
Power Intake Nos |
: 2 |
Intake Tunnel Dia. |
: 4.5 m x 2 |
Pressure Shaft Dia. |
: 6.35 m |
Pressure Shaft Length |
: 592 m |
Powerhouse |
: Underground Cavern type |
Turbine Centre Line |
: 356.4 masl |
Turbine |
: Francis (3 nos.) 300 rpm |
Tail Water Level |
: 360 masl |
Tailrace Tunnel Length |
: 1.2 km |
Tailrace Tunnel Dimension |
: D-shaped 8m x 8m |
Average Annual Energy |
: 874 GWh (after deduction of outages/losses) |
Average Annual Dry Energy |
: 305.90 GWh (35 %) |
Average Annual Wet Energy |
: 568.10 GWh (65 %) |
Access Road Length |
: 22.94 km from Jhilibang to project area (total) |
Transmission Length |
: 55 km (220 kV) Up to New-Lamahi Substation |
Gross Storage |
: 1066.85 MCM |
Active Storage |
: 694.33 MCM |
Dead Storage |
: 259.29 MCM |
Average River Bed Elevation |
: 362 masl |
Turbine Efficiency |
: 92% |
Generator Efficiency |
: 98% |
Generator Equipment Type |
: 3 Phase Synchronous, 85.62 MVA, 11 kV, 300 rpm |
Transformer Efficiency |
: 99% |
Project Cost |
: 91,922.937 Million NRs. (including costs from EIA) |
Per MW Cost |
: 375.05 Million NRs. |
Lamatal Hydro Scheme
District |
: Pyuthan/Arghakhanchi |
|
Catchment Area |
: 3572 km2 |
|
Installed Capacity |
: 8 MW |
|
Gross Head |
: 7 m |
|
Net Head |
: 6.65m |
|
Design Discharge |
: 136.20m3/s |
|
Tailrace Water Level: |
: 352 masl |
|
Full Supply Level (FSL) |
: 359 masl |
|
Minimum Operating Level (MoL) |
: 356 masl |
|
Barrage Crest Elevation |
: 360.5 m (1.5m freeboard) |
|
Reservoir/ Submergence Area |
: 1.22 km2 |
|
Power Intake Type |
3 Submerged Bellmouth Type Intakes |
|
Intake diameter |
: 5.6 m |
|
Spillway Type |
: Orifice Type Spillway equipped with Radial Gates |
|
No. of Spillway Bays |
: 22 ( 10m x 4m gates) |
|
Spillway Design Discharge |
: 7873 m3/s (1000 yrs Return Period Flood) |
|
Energy Dissipator |
Hydraulic-jump type Stilling basin |
|
Barrage Height |
: 15.5 m |
|
Powerhouse |
Semi-Surface Powerstation at Barrage Toe |
|
Penstock diameter |
: 4m |
|
Turbine Centre Line |
: 345 masl |
|
Turbine |
Kaplan (3 nos.) 150 rpm |
|
Tail Water Level |
352 masl |
|
Annual Gross Energy |
38.90 GWh (after deduction of outages/losses) |
|
Gross Dry Season Energy |
14.61GWh (37%) |
|
Gross Wet Season Energy |
24.29GWh (63 %) |
|
Access Road Length |
22.94 km from Jhilibang to project area (total) |
|
Transmission Length |
4.6km (33kV) to Naumure Switchyard |
|
Gross Storage |
6.46 MCM |
|
Active Storage |
: 3.02 MCM |
|
Average River Bed Elevation |
: 345 masl |
|
Site Coordinates |
: 82°53"22" E and 27°54"30" N |
|
Irrigation Facilities: |
||
Deukhuri |
:10,800 ha with 310.96Mm3 of annual water demand |
|
Banke |
:42,766 ha with 959.55Mm3 of annual water demand |
|
Kapilvastu |
:29,736 ha with 647.02 Mm3 of annual water demand |
|
Total= |
:83,302 ha with total 1917.53 Mm3 of annual water demand |
|
Turbine Efficiency |
: 92% |
|
Generator Efficiency |
: 98% |
|
Generator Equipment Type |
3 Phase Synchronous, 3.14 MVA, 6.6 kV, 150 rpm |
|
Transformer Efficiency |
99% |
|
Project Cost |
: 5,652.595 Million NRs. (including costs from EIA) |
|
Per MW Cost |
655.94 Million NRs. (including cost of Barrage, which is utilized for Surainaka Hydro Scheme as well as Irrigation Scheme) |
|
District |
: Arghakhanchi/Kapilvastu |
Catchment Area |
: not relevant as water will be conveyed from Lamatal Tailrace |
Installed Capacity |
. 54.7 MW |
Gross Head |
: 160 m |
Net Head |
: 148.66 m |
Water Level at Headpond |
: 351.5 masl |
Tailrace Water Level |
: 191.5 masl |
Design Discharge |
: 41.6 m3/s |
Intake Orifice nos: |
:4 (Q = 45.76m3/s, including 10% flushing) |
Intake Orifice Size: |
:4m (W) x 2.75m (H) |
Approach Canal after Intake Size: |
: 4m (W) x 5m (H), 2 nos |
Length of Canal |
:28.23 m |
Settling Basin effective length: |
: 100 m |
No. of bays |
: 2, 25m width each |
Approach Canal after Settling Basin: |
: 1 nos. |
Approach Canal after Settling Basin size: |
: 6m (W) x 5m (H) |
Length of Canal |
: 259.67 m |
Headpond before Tunnel |
: 6m (W) x 35m (L) |
Tunnel Length |
: 18 km |
Tunnel Diameter |
: 5.5 m (Finished Dia.) |
Tunnel Slope |
: 1:500 |
Surge Tank Type |
: Orifice type (4.5 m dia. Orifice) |
Surge Tank Diameter |
:12 m |
Penstock Diameter |
:3.8 m |
Penstock Length |
:1172.65m (including bifurcation) |
Powerhouse |
: Semi-Surface Type, 36.9m (L) x 17m (W) x 30m (H) |
Turbine Centre Line - |
180.5 masl |
Turbine |
: Francis (2 nos.) 500 rpm |
Tailrace Canal |
6m (W) x 2.9m (H), 1: 1000 slope |
Average Annual Energy |
362.81 GWh (after deduction of outages/losses) |
Gross Dry Season Energy |
: 173.92 GWh (48 %) |
Gross Wet Season Energy |
: 188.88 GWh (52 %) |
Access Road Length |
: 5.17 km from East-West Highway up to Surge tank |
Transmission Length |
: 22 km (220 kV) to Naumure Switchyard |
Irrigation Facilities: |
|
Kapilvastu |
:29,736 ha |
Turbine Efficiency |
:92% |
Generator Efficiency |
:98% |
Generator Equipment Type |
: 3 Phase Synchronous, 32.175 MVA, 11 kV, 500 rpm |
Transformer Efficiency |
: 99% |
Project Cost |
: 18,141.507 Million NRs. (including costs from EIA) |
Per MW Cost |
: 327.91 Million NRs. |
Salient Features of Proposed Kapilvastu Irrigation System
District: Kapilvastu District
Administrative Coverage: |
: Shivaraj Municipality (1 to 11) Krishnanagar Municipality( 1 to 12) Bijayanagar VDC (Ward no. 2 to 7) Buddhabhumi (ward no. 7) Maharajgunj (ward no. 1 to 11) |
Cultural Command Area (CCA): |
: 29,736 ha (20,243 ha on eastern side & 9,493 ha on western side) |
Source of Water
Proposed Major Crop Type: Paddy, Wheat, Pulses, Vegetables, Maize, Oilseed
Proposed Cropping Intensity:180%
Maximum Design Discharge: |
:43.2 m3/s (29.5 m3/s for East Main Canal & 13.7 m3/s for West main Canal) |
Diversion Type |
:Slice gate-controlled intake from Pondage with water supplied from tailrace(NTRL=191.5masl) of Surainaka hydropower |
Normal Pond Level at Diversion Pond 2: |
:186.75 masl |
Length of Main Canal: |
: 65.729 km (23.99km in East & 41.73km in the West) |
Length of Secondary Canal: |
: 152.24km (85.26km in the East & 67.08km in the West) |
Length of Tertiary Canal: |
: 273.66km (134.32km in the East & 138.33km in the West) |
Project Costs |
: NRs. 9120.76 (x 10^6) Excluding VAT |
Note: At 6 % Discount Rate and 2% soft loan (also feasible up to 9% discount rate for interest rate
Total Project Cost (HP, irrigation and EIA costs) : 113770.2301 Million NRs (Without VAT)
Total Project Cost (HP, irrigation and EIA costs) : 125,956.383 Million NRs (with VAT)
EIRR : 10.413 %
FIRR : 9.43 %
NPV : 35646.72 Million NRs.
B/C Ratio : 1.26
Payback Period : 14.06 years
Specific Energy Cost : 14.63
DSCR (Avg) :1.3